Sounding a stadium is a difficult task. The sound in the stadium must meet the requirements of sports leagues and provide a comfortable environment for fans. Getting sound into a stadium requires a lot of preparatory work. GT Light specialists will prepare a project, carry out all the necessary measurements and develop a plan for the arrangement of equipment. Before purchasing equipment, acoustic measurements are taken, on the basis of which a 3D model of the sports facility is created. Reverberation To create an effective speaker system, one of the most important parameters to figure out about a room is the reverberation time - the decay of the echo. If this time is long, the room is called echoing. In such structures, it is difficult to distinguish between speech and other sounds, they merge into a single hum. If there is practically no echo, then the room becomes "deaf". It is also uncomfortable to be in it, and conversations in such rooms tire both the speaker and the listener. Spo