Dear colleagues! I have talked about the Donskoy Aluminum construction company more than once. And he always wrote about this team and its director only in conjunction with the words: the best, highly professional, hardworking. And they keep giving it a reason. We always respect the work that requires not only competent engineering solutions, but also perseverance and self-confidence. The construction of a port fire-fighting conduit on the Don River can be divided into three stages: 1. Construction of working pits for MNBSH-600 up to 10 meters deep (judging by the photo). 2. Trenchless laying of two D630 pipes in accordance with the design slope into the water line of the Don River. 3. Trenchless laying of pipes D530mm for water intake from the Don River at a considerable depth from the water surface. The working pit was made using sheet piling. Pilot drilling with a length of 40 meters under the pipe D630mm was successful in accordance with the design slope. From the unusual fact that
"Only the brave conquer the seas!" (song from the movie "Children of Captain Grant").
4 ноября 20224 ноя 2022
25
2 мин