It is known that the cost of constructing water supply wells depends not only on the efficiency of drilling equipment and tools, but to a large extent on the labor and time spent on drilling preparation, including the delivery of equipment to the place of work, the deployment of the rig, as well as on auxiliary work in the process well construction. For this reason, when constructing wells up to 300 meters deep, production organizations prefer to use universal mobile Rigs with Rotary Heads, which have a less powerful drive than units specialized for production drilling with rotary tables, but mounted on vehicles of less weight and saturated with auxiliary equipment, such as hydraulic breakers, rod clamps, etc. An important factor determining the choice of drilling equipment is the minimum shift number of drilling personnel. So, if it is desirable to have at least three workers as part of a shift for efficient maintenance of rotary Rigs of the URB-2.5A and BA15 type, then to perform w
New model of the UGB family: Power. Mobility. Universality.
16 августа 201916 авг 2019
17
4 мин